Operational
Hyperscale
Liquid cooling
Tier III

Alibaba Hangzhou

Alibaba Cloud · Hangzhou

IT live
60 MW
Remaining
20 MW
$ / kW·mo
$71
White space
250k ft²

Inventory

75% occupied

Power

80 MWcampus

20 MW to commission · 60 MW in use

White space

333k ft²total

83k ft² free · 250k ft² occupied

31k m² · 7,742 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live60 MW
Remaining20 MW
Utility feed100 MW
Campus / planned80 MW

About 40 MW of the utility feed is cooling, conversion, and house load.

Power cost

$71/kW·mo

industrial · 9.8¢ after PUE 1.22

Per MW·year
$855k
This site · 60 MW
$51M/yr
20 kW rack
$1,425/mo
3.2¢ cheapdear 22.4¢

2.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $31M/yr less.

China industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2009
Renewable match
40%
Rack density
20 kW
PUE
1.221.00 ideal · 1.60 typical
Power source
State Grid / China Southern Grid. Dual municipal feeds.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Hangzhou, Zhejiang, China

Hangzhou, Zhejiang

30.274°, 120.155° · Asia

Tenants / users

Alibaba Cloud, Taobao, Apsara

Notes

Alibaba hometown core. Complements Zhangbei and Ulanqab.

Operator site