AirTrunk SYD3 Huntingwood
AirTrunk · Sydney West
- Planned IT
- 400 MW
- Free to lease
- 320 MW
- $ / kW·mo
- $122
- White space
- 1M ft²
Inventory
20% occupiedPower
400 MWlive
320 MW to lease · 80 MW in use
White space
1M ft²total
800k ft² free · 200k ft² occupied
93k m² · 74k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$122/kW·mo
14.2¢ industrial · 16.8¢ after PUE 1.18
- Per MW·year
- $1.5M
- This site · 400 MW
- $587M/yr
- 40 kW rack
- $4,893/mo
4.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $455M/yr less.
NSW NEM · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 85%
- Rack density
- 40 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- Endeavour Energy. Largest single APAC campus outside China.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
40 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hyperscale AI-ready. 330–400+ MW under construction.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Huntingwood, New South Wales, Australia
Huntingwood, NSW
-33.796°, 150.885° · Oceania
Tenants / users
Hyperscale
Notes
AirTrunk SYD3 — Australia's largest single data-center construction job in 2026.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.