Under construction
Colocation
Liquid cooling
Tier III

AirTrunk SYD3 Huntingwood

AirTrunk · Sydney West

Planned IT
400 MW
Free to lease
320 MW
$ / kW·mo
$122
White space
1M ft²

Inventory

20% occupied

Power

400 MWlive

320 MW to lease · 80 MW in use

White space

1M ft²total

800k ft² free · 200k ft² occupied

93k m² · 74k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease320 MW
Utility feed
Campus / planned400 MW

Power cost

$122/kW·mo

14.2¢ industrial · 16.8¢ after PUE 1.18

Per MW·year
$1.5M
This site · 400 MW
$587M/yr
40 kW rack
$4,893/mo
3.2¢ cheapdear 22.4¢

4.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $455M/yr less.

NSW NEM · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2027
Renewable match
85%
Rack density
40 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
Endeavour Energy. Largest single APAC campus outside China.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

40 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hyperscale AI-ready. 330–400+ MW under construction.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Huntingwood, New South Wales, Australia

Huntingwood, NSW

-33.796°, 150.885° · Oceania

Tenants / users

Hyperscale

Notes

AirTrunk SYD3 — Australia's largest single data-center construction job in 2026.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.