Operational
Colocation
Liquid cooling
Tier III

AirTrunk SYD2

AirTrunk · Sydney West

IT live
158 MW
Free to lease
17.4 MW
$ / kW·mo
$124
White space
658k ft²

Inventory

89% occupied

Power

158 MWlive

17.4 MW to lease · 141 MW in use

White space

658k ft²total

72k ft² free · 586k ft² occupied

61k m² · 6,728 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live158 MW
Free to lease17.4 MW
Utility feed198 MW
Campus / planned158 MW

About 39.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$124/kW·mo

14.2¢ industrial · 17¢ after PUE 1.20

Per MW·year
$1.5M
This site · 158 MW
$236M/yr
20 kW rack
$2,488/mo
3.2¢ cheapdear 22.4¢

4.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $183M/yr less.

NSW NEM · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2020
Renewable match
80%
Rack density
20 kW
PUE
1.201.00 ideal · 1.60 typical
Power source
Endeavour Energy plus AirTrunk renewable contracts.

Cooling

Plant

Evaporative

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Indirect evaporative plus liquid-ready expansion halls.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Sydney, New South Wales, Australia

Western Sydney, NSW

-33.790°, 150.900° · Oceania

Tenants / users

Hyperscale

Notes

Second AirTrunk Sydney campus, 158 MW+. Complements SYD1 Huntingwood.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.