AirTrunk MEL2
AirTrunk · Melbourne
- Planned IT
- 354 MW
- Free to lease
- 283 MW
- $ / kW·mo
- $119
- White space
- 885k ft²
Inventory
20% occupiedPower
354 MWlive
283 MW to lease · 70.8 MW in use
White space
885k ft²total
708k ft² free · 177k ft² occupied
82k m² · 66k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$119/kW·mo
13.8¢ industrial · 16.3¢ after PUE 1.18
- Per MW·year
- $1.4M
- This site · 354 MW
- $505M/yr
- 40 kW rack
- $4,755/mo
4.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $388M/yr less.
Victoria NEM · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2026
- Renewable match
- 85%
- Rack density
- 40 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- Victorian grid plus renewables. Initial power-on mid-2026.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
40 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
AI-ready hyperscale. 354 MW planned — among Australia's largest announced buildings.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Melbourne, Victoria, Australia
Melbourne, VIC
-37.785°, 144.830° · Oceania
Tenants / users
Hyperscale
Notes
MEL2 is the largest tracked Australian AI/hyperscale pipeline site by MW.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.