Airtel Nxtra Lagos
Airtel Africa (Nxtra) · Lagos
- Planned IT
- 38 MW
- Free to lease
- 30.4 MW
- $ / kW·mo
- $125
- White space
- 158k ft²
Inventory
20% occupiedPower
38 MWlive
30.4 MW to lease · 7.6 MW in use
White space
158k ft²total
127k ft² free · 32k ft² occupied
15k m² · 12k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$125/kW·mo
13.2¢ industrial · 17.2¢ after PUE 1.30
- Per MW·year
- $1.5M
- This site · 38 MW
- $57M/yr
- 20 kW rack
- $2,505/mo
4.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $43M/yr less.
Ikeja / Eko Disco · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 20%
- Rack density
- 20 kW
- PUE
- 1.301.00 ideal · 1.60 typical
- Power source
- Ikeja Electric / TCN plus heavy on-site generation. Designed around Lagos grid unreliability.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Lagos, Lagos, Nigeria
Lagos, Nigeria
6.540°, 3.360° · Africa
Tenants / users
Airtel, hyperscale, enterprise, IXPN
Notes
First of five planned Airtel/Nxtra hyperscale halls in Africa. Largest announced single Nigerian DC (38 MW).
Compiled from public filings, operator pages, and reporting. Not an official operator specification.