Operational
Colocation
Liquid cooling
Tier III

Africa Data Centres LOS1 Eko Atlantic

Africa Data Centres · Lagos

IT live
10 MW
Free to lease
2 MW
$ / kW·mo
$130
White space
57k ft²

Inventory

80% occupied

Power

10 MWlive

2 MW to lease · 8 MW in use

White space

57k ft²total

11k ft² free · 45k ft² occupied

5,279 m² · 1,056 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live10 MW
Free to lease2 MW
Utility feed25 MW
Campus / planned20 MW

About 15 MW of the utility feed is cooling, conversion, and house load.

Power cost

$130/kW·mo

13.2¢ industrial · 17.8¢ after PUE 1.35

Per MW·year
$1.6M
This site · 10 MW
$16M/yr
12 kW rack
$1,561/mo
3.2¢ cheapdear 22.4¢

4.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $12M/yr less.

Ikeja / Eko Disco · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2024
Renewable match
20%
Rack density
12 kW
Voltage
PUE
1.351.00 ideal · 1.60 typical
Power source
Ikeja Electric / TCN plus heavy on-site generation. Designed around Lagos grid unreliability.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Lagos, Lagos, Nigeria

Eko Atlantic, Lagos

6.423°, 3.435° · Africa

Tenants / users

Cloud, enterprise, finance, networks

Notes

10 MW Eko Atlantic hall. ADC's West Africa flagship.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.