Africa Data Centres JHB1
Africa Data Centres · Johannesburg
- IT live
- 14 MW
- Free to lease
- 2.5 MW
- $ / kW·mo
- $95
- White space
- 97k ft²
Inventory
82% occupiedPower
14 MWlive
2.5 MW to lease · 11.5 MW in use
White space
97k ft²total
18k ft² free · 80k ft² occupied
9,032 m² · 1,626 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 11 MW of the utility feed is cooling, conversion, and house load.
Power cost
$95/kW·mo
9.4¢ industrial · 13¢ after PUE 1.38
- Per MW·year
- $1.1M
- This site · 14 MW
- $16M/yr
- 8 kW rack
- $758/mo
2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $10M/yr less.
Eskom Gauteng · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2017
- Renewable match
- 20%
- Rack density
- 8 kW
- PUE
- 1.381.00 ideal · 1.60 typical
- Power source
- Eskom plus on-site diesel and solar. Extended runtime sized for load-shedding ride-through.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
8 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Liquid-ready suites offered on newer campus halls.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Johannesburg, Gauteng, South Africa
Johannesburg, Gauteng
-26.150°, 28.180° · Africa
Tenants / users
Cloud, enterprise, Liquid fiber
Notes
ADC Johannesburg flagship. Cassava Technologies / Liquid Intelligent Technologies group.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.