Operational
Colocation
Air cooled
Tier III

Africa Data Centres CPT1

Africa Data Centres · Cape Town

IT live
10 MW
Free to lease
2 MW
$ / kW·mo
$101
White space
69k ft²

Inventory

80% occupied

Power

10 MWlive

2 MW to lease · 8 MW in use

White space

69k ft²total

14k ft² free · 56k ft² occupied

6,452 m² · 1,290 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live10 MW
Free to lease2 MW
Utility feed17.5 MW
Campus / planned14 MW

About 7.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$101/kW·mo

10.2¢ industrial · 13.9¢ after PUE 1.36

Per MW·year
$1.2M
This site · 10 MW
$12M/yr
8 kW rack
$810/mo
3.2¢ cheapdear 22.4¢

3.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.3M/yr less.

Eskom / City of Cape Town · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2018
Renewable match
20%
Rack density
8 kW
Voltage
PUE
1.361.00 ideal · 1.60 typical
Power source
Eskom plus on-site diesel and solar. Extended runtime sized for load-shedding ride-through.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

8 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Liquid-ready suites offered on newer campus halls.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Cape Town, Western Cape, South Africa

Cape Town

-33.930°, 18.450° · Africa

Tenants / users

Cloud, enterprise, subsea

Notes

ADC Cape Town. Complements Teraco CT campus.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.