A1 Ljubljana
A1 Slovenija · Ljubljana
- IT live
- 3 MW
- Free to lease
- 0.4 MW
- $ / kW·mo
- $137
- White space
- 39k ft²
Inventory
86% occupiedPower
3 MWlive
0.4 MW to lease · 2.6 MW in use
White space
39k ft²total
3,281 ft² free · 36k ft² occupied
3,629 m² · 305 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 2 MW of the utility feed is cooling, conversion, and house load.
Power cost
$137/kW·mo
14.2¢ industrial · 18.7¢ after PUE 1.32
- Per MW·year
- $1.6M
- This site · 3 MW
- $4.9M/yr
- 6 kW rack
- $821/mo
4.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $3.8M/yr less.
BSP SouthPool · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2011
- Renewable match
- 60%
- Rack density
- 6 kW
- PUE
- 1.321.00 ideal · 1.60 typical
- Power source
- ELES / GEN-I. Dual 10 kV. Nuclear (Krsko) plus hydro.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
6 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Isolated hot aisles. Not an AI factory unless noted.
Network carriers
2On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Ljubljana, Ljubljana, Slovenia
Ljubljana
46.057°, 14.506° · Europe
Tenants / users
Enterprise, A1 cloud, SIX-adjacent
Notes
A1 Telekom Austria group. Slovenian commercial colo. Krsko nuclear plus Alpine hydro.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.