Sites
6
IT load
3.6 MW
Available
3.0 GW
Avg industrial
12.7¢

6 sites

Capacities are IT load unless marked planned. Free MW is unsold colo IT or remaining hyperscale to commission. Power $ is PUE-inclusive utility cost per kW of IT per month — not colo list price. WUE is litres of water per kWh of IT, shown only where the operator published it (usually a fleet average). Figures are compiled from public disclosures and may lag operator updates.