Sites
9
IT load
260 MW
Available
18.7 MW
Avg industrial
17.5¢

9 sites

1 countries

Capacities are IT load unless marked planned. Free MW is unsold colo IT or remaining hyperscale to commission. Power $ is PUE-inclusive utility cost per kW of IT per month — not colo list price. WUE is litres of water per kWh of IT, shown only where the operator published it (usually a fleet average). Figures are compiled from public disclosures and may lag operator updates.